Frequently Asked Questions

A new data centre on a former industrial site at Acton Lane, Park Royal.

What is a data centre?

A secure building that houses computer servers and the technology that supports them. These servers store, process and move the digital information behind almost everything we do online.

What is being proposed at the Frogmore site?

We are proposing to develop the Frogmore Industrial Site by demolishing the existing industrial buildings and constructing a new data centre and Community Centre. The proposals include a new electrical substation to connect the data centre to the wider network, and backup generators that would provide power in the unlikely event of a loss of grid connection.

Is this the same as the previous data centre proposal?

No. Our plans are separate and have been developed independently. We have listened to concerns raised before, and our design is lower and simpler, with a construction plan designed to reduce disruption.

Has the data centre already been approved?

No. Only the demolition of the existing buildings has been approved. No decision has been made on the data centre itself. A separate full application will follow this consultation.

Why is a data centre needed here?

Data centres support the digital services people and businesses rely on every day. Park Royal already has the power, connections and infrastructure they need, and the site already has outline planning consent for a data centre.

Will the development be sustainable?

Yes. Our new-build facilities are built to a high environmental standard, and 100% of the electricity we use is matched by renewable energy made in the UK. We were the first operator in Europe to switch our back-up generators from diesel to renewable HVO fuel. Visit our Environment and Sustainability page for more information.

Will it use a lot of water?

No. The data centre will use liquid cooling which greatly reduces water use, with no impact on local supply or pressure. The lifetime water consumption of the data centre is therefore expected to be very low. By comparison, over a similar period, a typical family household would consume substantially more water through normal day-to-day activities such as bathing, washing, cooking and drinking. Visit our Environment and Sustainability page for more information.

Will it increase temperatures locally?

It uses liquid cooling to manage heat efficiently at source, rather than releasing large volumes of warm air. We are also designing it so it could connect to a future heat network, reusing spare heat locally. Visit our Environment and Sustainability page for more information.

Will it be noisy or cause light pollution?

Data centres are very quiet. The design is set to meet the OPDC’s noise requirements, with sound-reducing measures built in. Lighting will be carefully placed and angled to avoid affecting nearby homes. Visit our Environment and Sustainability page for more information.

How will construction be managed?

Through plans agreed with the OPDC, covering dust, noise, vibration, lighting and traffic. A Construction Working Group and a named Community Liaison Manager will give residents a clear point of contact so issues can be raised and resolved quickly. Visit our Construction Management page for more information.

Will there be a lot of traffic?

A temporary increase during demolition and construction, including HGVs, managed through an agreed logistics plan using Acton Lane. Once operating, the data centre creates very little daily traffic and needs no regular HGVs. Visit our Construction Management page for more information.

How will the development benefit the community?

Through local investment, jobs, supply chain opportunities, skills and education pathways, community funding through the Kao SEED Fund, and possible community uses such as workspace, a pocket park or community building. Visit our Community Investment page for more information.

Who decides whether it goes ahead?

The Old Oak and Park Royal Development Corporation (OPDC), the local planning authority for the area. Its Planning Committee will decide the application.

Thank you for taking part in our consultation

Our public consultation ran from Monday 7 September to 11:59pm Thursday 24 September 2026.

The feedback received will help shape things like the appearance of the building, landscaping and green spaces, and how construction is managed.

Get in Touch

If you have a query, or want to speak to a member of the team, please get in touch: