A new data centre on a former industrial site at Acton Lane, Park Royal.

The planning process will assess issues such as water, heat, energy, noise, lighting, air quality, traffic and visual impact.

Where impacts are identified, we’ll build in measures to reduce or manage them.

The annual water demand for the data centre will be confirmed through the detailed design process. However, the proposed liquid cooling systems operate using a closed-loop circuit – once it’s filled, the system recirculates the same water rather than using fresh water. This means the data centre won’t affect local water supplies or pressure.

As a result, the lifetime water consumption of the cooling system is expected to be very low. By comparison, over a similar period, a typical family household would consume substantially more water through normal day-to-day activities such as bathing, washing, cooking and drinking.

We will also publish our water performance every year as part of our annual Environmental, Social, and Governance (ESG) reporting. The most recent report includes Water Usage Effectiveness metrics and water consumption data across our facilities. We will continue to report on our environmental performance, including water efficiency, as part of our ongoing ESG commitments, and we’ll work with Thames Water to ensure our progress stays open and transparent.

The data centre will use liquid cooling, where liquid helps remove heat from computer equipment. This manages heat at source and significantly reduces water use.

We’re also designing the scheme so it could connect to a future local heat network, if one becomes available. This could allow surplus heat to be reused to benefit the local area. We’ll work with local partners, including the OPDC’s Old Oak Park Energy Network, to explore how this could work.

100% renewable energy

We’re proud of our track record of designing, building and operating some of the world’s most sustainable data centres. Through established agreements with UK wind farms, we ensure that all the electricity used at our facilities is matched by 100% certified renewable energy produced in the UK.

Backup power

Backup generators would only be used during rare grid outages or short scheduled tests during daytime hours.

We use renewable hydrotreated vegetable oil (HVO) fuel, rather than fossil fuel diesel, across our generators, cutting net CO2 emissions by around 90%.

A planned grid connection 

Our connection to the electricity grid is already confirmed. This means our electricity needs have been planned for within the system, rather than placing new, unplanned demand on the local network. 

Thank you for taking part in our consultation

Our public consultation ran from Monday 7 September to 11:59pm Thursday 24 September 2026.

The feedback received will help shape things like the appearance of the building, landscaping and green spaces, and how construction is managed.

Get in Touch

If you have a query, or want to speak to a member of the team, please get in touch: